Tel: +44 (0)114 269 9119
Tel: +44 (0)114 269 9119
March 04, 2022 1 min read
Our latest video guide walks you through how to install and use the Long Handle Attachment for the Easy Petrol Post Driver. The long handles give an extra 60cm of length, and can either be installed in the bottom of the Easy Petrol Post Driver for driving in extra long posts (such as deer fencing, or vine posts), or in the top of the machine if you are driving in posts on a hillside below your feet.
1. Insert the Long Handles from below (or above if using reverse) into the handle tubes.
2. Connect the supplied M10x340 Bolts into the other end of the handle tubes, and tighten.
3. Open the Air Filter Cover and switch over the Throttle Cable.
4. Test the machine to ensure the Long Handles are installed correctly. You may need to adjust the Throttle Release Screw.
5. Start using your Post Driver for even more applications, safely knowing you wont need ladders or platforms for those pesky long posts!
We will be closed for the Christmas period from Friday 20th December 2024, until Thursday 2nd January 2025. Any orders received between these dates will be processed upon our return in January.
The current lead time on all orders is approximately 5-7 working days. We will endeavour to dispatch your order at the earliest opportunity. For any urgent orders, please contact our office +44 (0)1142 699119